Private Residence

Location: Point Roberts, WA
Project Size: 1000 sq ft
Installation Date: June 2010
Certified Installer: PDS Construction
Plant Mix: Sedums, Bulbs and Perennials mix

Private Residence

Location: Pender Harbour
Project Size: 1386 sq ft
Installation Date:  June 2010
Certified Installer: Landwise Consultants
Plant Mix: Sedum mix

Private Residence

Location: Vancouver BC
Project Size: 800 sq ft
Installation Date: December 2009
Designer: Dr. Vincent Tony Wong
Plant Mix: Sedum mix

Salvation Army- Gateway of Hope

Location: Langley
Project Size: 2856 sq ft
Date of Installation: October 15, 2009
Installed by : Kwantlen Horticulture Students
Plant Mix: Sedum mix with assorted native perennials as accent

KENDA

Location: Calgary AB
Project Size: 1650 sq ft
Date of Installation: August 17, 2009
Architect: Smart Timberframes
Plant Mix : Zone-specific Sedum mix

Recreation Centre at the Athlete's Village for the 2010 Winter Olympics


Location:                    False Creek Waterfront, Vancouver, BC
Project Size:              10 500 square feet
Installation Date:        August 2009
Project Architect:       Durante Kreuk Ltd.
LiveRoof Certified Installer: Horizon Landscapes
Plant Assemblage:      A mix of grasses and sedums.

Woodlands Assisted Living

Location:                      New Westminster, BC
Project Size:                876 square feet
Installation Date:          July, 14, 2008
Project Architect:        Sharp and Diamond Architecture Inc.
LiveRoof Certified Installer:  North by Northwest Ventures Inc.
Plant Assemblage:       Trays of Festucas, Poa spp., Sedum spp., Anaphalis and Eriophyllum spp.

Glotman-Simpson


(Photo Courtesy of Glotman-Simpson)

Location:                  West Vancouver, BC
Project Size:             316 Square feet
Installation Date:       June 08
Project Architect:     Glotman-Simpson Consulting Engineers
Plant Assemblage:    LiveRoof Lite Trays with assorted Sedum spp.

Synthesis Design


Location:                  North Vancouver, BC
Project Size:            184 square feet
Installation Date:      June 20, 2008
Project Architect and Installer:  Synthesis Design
Plant Assemblage:   Assorted sedum spp., Sisyrinchium spp. and Narcissus spp.